Drawing 08.9 records the bag hoist system and
location in relation to the tower centre line proposed in plan drawings 08.10 –
13.Drawings 08.10 – 13
These relate the bag hoist
to floor structure and the original chain bollard position and provide a means
for accurate location during reconstruction of the floors.
Drawing 08.10 also
indicates preliminary beam, post and bearer locations for the first and second
floors.
Drawing 08.12 indicates
bulk grain bin locations in relation to the tower, bag hoist and smutter crown
wheel. This drawing should be read in conjunction with drawing 08.16 which shows
alternative grain bins.
Drawings 08.14, 15 and
20
This is a new set of floor
plans and one vertical section essentially the same as before (drawings 06.29A,
30A, 31A and 39A included with the estimate of non-millwright items, Figure 6 of
the Second Supplement to the 1994 Conservation Plan, and what the millwright
drew out on the floors of the actual mill) but with the ladders in the proposed
new locations and some other suggested improvements.